← Document collections
TNA / ADM 199 792

TNA ADM 199 792

TNA ADM 199 792
Collection details

TNA ADM 199 792

Admiralty records concerning Operation Dynamo and the evacuation of troops from Dunkirk, covering 1940–1941.

Holding archive
TNA
Collection reference
ADM 199 792
View the archive catalogue entry ↗

Source: The National Archives, Kew, ADM 199/792. Contains public sector information licensed under the Open Government Licence v3.0.

Showing only document page 81. Show all matching pages ×

1 matching pages. OCR may contain transcription errors.

List page 1 of 1 Showing document pages 81–81 of this collection
Page ImageOCR textOCR tags
81 Page 81 Log in to enlarge

142
140
CONFIDENTIAL.
Page 21.
Operation "DYNAMO" - Narrative of Events.
31/5
Friday, 31st May (continued).
63. General Lloyd informed the D.M.O. of the new plan, stating that General Alexander had been placed in command of the final phase of the evacuation. Composition of force not known. Further, that it was impossible now to say how long the French evacuation would take but that the Alexander force would remain till the last. No firm information could be obtained from the French as regards:-
(i) The number of French troops to be evacuated.
(ii) The nature and extent of French sea borne transport.
(iii) The French military plan for the defence of the perimeter and the final withdrawal of French troops.
64. General remarks: The main features of the day were:-
(a) The increased enemy artillery activity on Dunkirk and La Panne beach, and on the approach channels.
(b) The set-back to evacuation from the beaches that occurred during the choppy weather of the forenoon, followed by an excellent recovery inthe afternoon and evening when large numbers were lifted from the beaches.
(c) The change in the military plan as regards the locality and time of lifting the final contingents of the B.E.F.
It should be noted that in spite of (b) the rate of embarkation had, in fact, come up to expectations, and if other circumstances had permitted it would have been possible to adhere to the original plan of lifting the final 4,000
B.E.F. off the beaches between 0130 and 0300 1st June.
65/

Raw OCR

Unformatted machine-generated OCR for document page 81.

142
140
CONFIDENTIAL.
Page 21.
Operation "DYNAMO" - Narrative of Events.
31/5
Friday, 31st May (continued).
63. General Lloyd informed the D.M.O. of the new plan,
stating that General Alexander had been placed in command of
the final phase of the evacuation. Composition of force not
known. Further, that it was impossible now to say how long
the French evacuation would take but that the Alexander force
would remain till the last. No firm information could be
obtained from the French as regards:-
(i) The number of French troops to be evacuated.
(ii) The nature and extent of French sea borne transport.
(iii) The French military plan for the defence of the
perimeter and the final withdrawal of French
troops.
64. General remarks: The main features of the day
were:-
(a) The increased enemy artillery activity on Dunkirk
and La Panne beach, and on the approach channels.
(b) The set-back to evacuation from the beaches that
occurred during the choppy weather of the forenoon,
followed by an excellent recovery inthe afternoon
and evening when large numbers were lifted from the
beaches.
(c) The change in the military plan as regards the
locality and time of lifting the final contingents
of the B.E.F.
It should be noted that in spite of (b) the rate
of embarkation had, in fact, come up to expectations, and if
other circumstances had permitted it would have been possible
to adhere to the original plan of lifting the final 4,000
B.E.F. off the beaches between 0130 and 0300 1st June.
65/