Admiralty records concerning Operation Dynamo and the evacuation of troops from Dunkirk, covering 1940–1941.
Source: The National Archives, Kew, ADM 199/792. Contains public sector information licensed under the Open Government Licence v3.0.
1 matching pages. OCR may contain transcription errors.
| Page | Image | OCR text | OCR tags |
|---|---|---|---|
| 459 |
|
Cofy sent & Controller a entry. Hanson |
Unformatted machine-generated OCR for document page 459.
Cofy sent & Controller a entry. Hanson N2. 25/9 seriatim. Taking the recommendations of the enclosed Reports fitted with a long the range after end gun of the a short pole mast 2. The mainmast has A.A. now been and removed. in all destroy take the aerials. gantry fitted at searchlight platform 3. Will D.N.O. please remark re availability of Bifficulty will be experienced in finding suitable positic gun a large number of single barrel type. (mistead of faw 4. (i) In later destroyers fitted with a tripod foremas would be practicable to fit a 24" searchlight on the forem if the signal yard were omitted. At certain speeds some vibration is likely to occur. On T.S.D. 916/40 D.O.D. (H) has remarked on such a proposal as follows:- "It would appear that no modifications to the po of searchlights should be undertaken without fu investigation." (ii) Action to site A/A guns on an extended S/L plat has already been taken in a number of older destroyers. 5. No objection if weight is small. Presume D.N. will remark. (Shelds for A/A fund 6. E. in C. referred. (Ant May - Plean leads 7. The Diesel Generators are fitted in No.1 Boiler 1 1 all classes of destroyer, and are thus separate from the -genermarency destroyers the 2 diesels also will be separated claotho-generators which are in the engine room. In the 4th 1 ency ds unother. other. Improved arrangements for fire service and pumpi a yers are under consideration on other papers. No objection. (Elechi torches) tisio. aiplosion at any part of her can up Whipping of the ship be set by a heavy is resulting at the being greatest at two length, the dealt in consideration 11. this with (i) vicinity position separately The has in supply been where New for given Construction. the existing to damage points, strengthening ships. has The question the structure now be dealt carry with on A.F.O. 2717/40 of additional on lifefloats has given to complement. lifefloats with life saving which capacity approval equal is to 100% of (11) C.A.F.O. 3202/39 states that the steel safes to