Cabinet Office papers concerning the proposed publication of a book about Operation Dynamo and the 1940 evacuation from Dunkirk, dating from April 1949 to February 1950.
Source: The National Archives, Kew, CAB 103/191. Contains public sector information licensed under the Open Government Licence v3.0.
1 matching pages. OCR may contain transcription errors.
| Page | Image | OCR text | OCR tags |
|---|---|---|---|
| 57 |
|
4. |
Unformatted machine-generated OCR for document page 57.
4. 12. Intorcommunication From To By Dover Landing Controls) } Priority calls on P.O. Redhill lines or by railway telephone. War Office Redhill Priority call on P.O. line or through S.Rly. (Deepdene or Waterloo). Redhill Aldershot By railway telephone Salisbury or through S.Rly. Deepdene. 11 Reading Priority call on P.O. line or by railway telephone Redhill Banbury P.O. line to provide for breakdown of telephone communication. The following wireless links will be established if possible Dover Ashford For control of empty train Faversham working to East Kent. points. Dover Redhill do. for Sussex points and for maintaining liaison for control service. A pool of D.Rs. will be established at Dover and at Redhill 13. Road transport for the East Kent group of landing points. Reserves of road transport will be held at Dover and Ramsgate 14. Subsequent redistribution The reception areas in para. 6 tide over the immediate accommodation problem but within a few days personnel will be sorted out and railed under Command arrangements to areas where units will reform. For this redistribution separate instructions will be issued. 24/5/40 Director of Movements.